System for waterproofing and installing floor and wall coverings with ready-to-use products in newly constructed damp environments

New building
Wet environments
Waterproofing

Products

1
Concrete substrate
2
Uncoupling layer
3
Screed
Position a series of levelling guides, spread the mix, carefully compact the mix and float-finish the surface.
4
Ready-to-use waterproofer
Apply two layers of product with a trowel, roller or brush to form a total thickness of at least 0.8 mm.
5
Rubber tape
Apply the elastic tape for fillet joints on the first layer of MAPEGUM WPS while still fresh.
6
Adhesive
Apply the adhesive on the substrate with a notched trowel suitable for the type and format of the tiles to ensure the back of the tiles is sufficiently wetted. Use the double-buttering method where specified by UNI 11493-1.
7
Ceramic tiles
8
Grout
Once the adhesive has set, carefully fill the grouts to their full depth using a rubber trowel without leaving gaps or steps.
9
Sealant
Seal the perimeter and expansion joints after inserting MAPEFOAM to set the correct depth.
10
Plasterboard
11
Adhesive
Apply the adhesive on the substrate with a notched trowel suitable for the type and format of the tiles to ensure the back of the tiles is sufficiently wetted.
12
Ceramic tiles
13
Grout
Once the adhesive has set, carefully fill the grouts to their full depth using a rubber trowel without leaving gaps or steps.
14
Sealant
Seal all sanitary units.

Documentation

You may be interested in Waterproofing
NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news